Completed Projects

S

triving to convert every project into a successful accomplishment, we at G R Infraprojects Limited ensure to aspire and work towards achieving this. We are fortunate to showcase a comprehensive listing of our Complete Projects across different segments. Explore and learn about our project accomplishments in detail.

HAFA and FABA PROJECT

  • Widening and Strengthening of existing Two-Lane carriageway to Four Lanes with paved side shoulders of Harike – Zira – Faridkot section of NH-15 (New NH No. 54) from existing Km. from existing Km. 166.925 to 221.380 of NH-15 including construction of Zira, Talwandi and Mudki Bypasses in the State of Punjab on EPC Mode under NHDP-IV for a total Length of 54.46 Kms.
  • Widening and Strengthening of existing Two-Lane carriageway to Four Lanes with paved side shoulders of Faridkot-Kotkapura-Bathinda Section of NH-15 (New NH No. 54) from existing Km. 221.380 to 287.615 of NH-15 including construction of Faridkot-Kotkapura bypass in the State of Punjab on EPC mode under NHDP-IV for a total length of 61.62 Kms.

Bahraich Rupaida Project

Rehabilitation and Upgradation of Bahraich to Rupaidiha section of NH–28C for a project length of 51.20 Kms

Moradabad Bareilly Project

Widening of Moradabad Bareilly section of existing 2 lane road to 4 lane dual carriageway and construction of minor structures of NH-24 from km. 190.000 to km. 236.5000 (46.500 Km) for a project length of 46.50 Kms .

Reengus Sikar Project

Four Laning of Reengus to Sikar Section of NH-11 from existing chainage 298.075 (design chainage Km. 297.850) to existing chainage Km. 341.047 (design chainage Km. 342.280) (approx length 44.43 Km.) on BOT (Annuity) project on DBFOT pattern under NHDP Phase III Project for a project length of 43.89 Kms

Hazaribagh Ranchi Project

Four Laning of Hazaribagh – Ranchi Section of NH-33 from Km. 40.500 to Km. 114.000 in the State of Jharkhand under NHDP Phase III on BOT (Annuity) Basis. (73.500 Km) for a project lenght of 73.50 Kms

G R Infra Airport Projects

We have also executed airport related infrastructure projects wherein our scope of work has included runway-related construction, including extension, strengthening and resurfacing. Details of these projects are set out below:

  • Extension and strengthening of runway for operation of wide bodied jet aircraft of ‘E’ – category including provision of CAT-II lighting system at Jaipur airport in the state of Rajasthan for a contract value of Rs 95.92 Crore.
  • Resurfacing of runway at air force station in Jodhpur in the state of Rajasthan for a contract value of Rs 71.74 crore.