Projects


Completed Projects


Some of the major road EPC projects completed by our Company, are set out below:

We have also executed two airport related infrastructure projects wherein our scope of work has included runway-related construction, including extension, strengthening and resurfacing. Details of these projects are set out below:


Ongoing Projects


As on May 31, 2016, the top five projects (in terms of value) constituting a part of our Order Book are set out below.

S.No. Name of Project State
1.

Four laning of Parwanoo - Solan section of NH-22 (Now NH 5) from km 67.000 to 106.139 on EPC mode under NHDP Phase-III in the state of Himachal Pradesh.

Himachal Pradesh
2.

Two laning with paved shoulders of Chhapra Gopalganj section of NH - 85 from km 0.00 to km 93.500 (Existing chainage) and km 0.00 to km. 94.258 (Design Chainage) (Total Design Length: 94.258 km) in the State of Bihar on EPC mode.

Bihar
3.

Widening and strengthening of existing two-lane carriageway to four - lanes with paved side shoulders of Harike – Zira – Faridkot section of NH-15 (new NH No. 54) from existing km. 166.925 to 221.380 of NH-15 including construction of Zira, Talwandi and Mudki Bypasses in the State of Punjab on EPC Mode under NHDP-IV.

Punjab
4.

Widening and strengthening of existing two-lane carriageway to four-lanes with paved side shoulders of Faridkot – Kotkapura - Bathinda section of NH-15 (new NH No. 54) from existing km. 221.380 to km. 287.615 of NH-15 including construction of Faridkot - Kotkapura bypasses in the State of Punjab on EPC mode under NHDP-IV.

Punjab
5.

Four laning of Hisar to Dabwali section of NH-10 from km. 227.000 to km 314.660 with paved shoulder in the State of Haryana (Package – II).

Haryana